Product Detail

N4005 NERO INSULATION SCREED Interior & Exterior Insulation Screed

N4005 NERO INSULATION SCREED
Interior & Exterior Insulation Screed

Ready plaster that provides smooth surface finish, heat, fire, water, sound insulation; Hydraulic connector interior & exterior insulation screed in the form of screed containing naturally occurring silica-based volcanic rocks, allowing the application surface to breathe.

Consumption Average 9-10 kg/m2 (For 1 cm Thickness)
Package 20 kg kraft bags.
N4005 NERO INSULATION SCREED
Quality Certificates:
Manufactured according to TS EN 998-1 (GP)

Whatsapp

Places of Usage
• Used on floors of buildings where water, heat and sound insulation are required.

Features/ Advantages
• Mixed with water only.
• Extremely smooth surface.
• Polymer reinforced, provides high adherence without primer.
• Does not shrink.
• Resistant to water, frost and bad weather.
• Quick setting and does not crack.

Application Directions
a) Surface Preparation:
The application surface is free of dust, oil and dirt. If there is loose ground on the surface, it should be cleaned up to solid concrete surface. Lats that determine the thickness to be applied of N4005 NERO INSULATION SCREED are nailed at appropriate intervals to form anos.

b) Product Preparation:
For the homogeneous mixture of N4005 NERO INSULATION SCREED the entire package is used at one time. Depending on the size of the area to be used, the mixture is made with concrete mixer, screed machine or low speed mixer. Mortar type tip is used in the mixer. 13-15 liters of water is put into a clean mixing vessel and 20 kg of material is poured and mixed with a mixer until all lumps disappear. The total mixing time is 5 minutes. Allow to rest for about 5 minutes and mix again for 30 seconds. The material is ready to use.
c) Primer:
Multipurpose primer should be applied with a brush in the amount of 1 00 g/m2. When the primer dries, a unscratchable, transparent film layer is obtained. Permeable surfaces should be primed twice. The second coat primer should be applied after the first coat by diluting in a ratio of 1 /1 to 100 grams per m2.
d) Application Method:
N4005 NERO INSULATION SCREED, which is prepared in consistency, is applied by hand at least 2 cm - maximum 20 cm between the anos and jigged with the help of a gauge without pressing. When the first set time of N4005 NERO INSULATION SCREED expires, the anos are removed and the gaps are filled with N4005 NERO INSULATION SCREED After N4005 NERO INSULATION SCREED has dried, 4-5 mm joint cutting should be performed with a joint cutting machine at regular intervals. The joints should be filled by selecting a suitable joint sealant.

Issues to be Considered
N4005 NERO INSULATION SCREED should not be used in environments where the floor temperature is below+ 5° C. If the floor temperature is above + 25° C, the surface should be moistened.
N4005 NERO INSULATION SCREED applied at 23 ° C reaches its final strength after 14 days. At low temperatures this period is extended.
• Water and powder are not added to the mixture which has started to set.

Cleaning of Tools:
Tools and equipment used should be cleaned with water after the application. N4005 NERO INSULATION SCREED can only be removed mechanically from the surface after hardening.

Security Warnings
• S2 Keep out of the reach of children.
• S24/25 Avoid contact with eyes and skin.
• S26 In contact with eye, wash with water and consult a doctor.
• S28 In contact with skin, wash immediately with plenty of water.
• S29 Do not empty into drains.
• S46 If swallowed, consult a doctor immediately and show box or label.

Storage
It should be stored in unopened original package ina cool and dry environment by protecting from frost. For short-term storage, maximum 3 pallets should be placed over and over and the shipment should be made with first in first out system. For long-term storage, pallets should not be placed over and over. It can be stored for 12 months from the date of production if proper storage conditions are met. Opened packages should be kept tightly closed and stored under proper storage conditions and should be used within one week.

Consumption Average 9-10 kg/m2 (For 1 cm Thickness)
Package 20 kg kraft bags.

N4005 NERO INSULATION SCREED
Quality Certificates:
Manufactured according to TS EN 998-1 (GP)

Export to the Middle East and Europe

Production with Special Production Techniques

Recipes for All Needs

Full Time Secure Shipping

Copyrights © 2024 Neroflex