N7001-03/04 REPAIR ART CR
Structural Repair Mortar
It is used in interior and exterior of all buildings especially in under ground, ground surface and underwater floors where sulfate and chlorine resistance is desired; chamfering application, repair surface correction before waterproofing or final coating; repair of concrete and reinforcements which damaged due to abrasion of reinforcing irons. It is fine/thick structural repair mortar.
Consumption
The recommended amount of consumption for 2 mm thickness at 1 m2 3,4 - 3,8 kg. This value may vary depending on surface and ambient conditions.
Package 25 kg kraft bags.
N7001-03/04 REPAIR ART CR
Quality Certificates:
Manufactured according to TS EN 1504-3
Places of Usage
• It is used in conjunction with adhesion promoter primer in interior and exterior of all buildings especially in under ground, ground surface and underwater floors where sulfate and chlorine resistance is desired, chamfering application, repair, surface correction before waterproofing or final coating, repair of concrete and reinforcements which damaged due to abrasion of reinforcing irons, it gives excellent results especially in chamfering, filling of rod holes and drilling cores.
Features/ Advantages
• Due to its high compressive strength, it provides effective results in structural repairs.
• It is used in structural repair of all kinds ofreinforced concrete structural elements.
• Very high adhesion strength.
• It forms a durable and smooth surface after application.
• Does not contain sulphate and chloride ions.
• Resistant to water and frost.
• Easy to prepare and apply.
Application Directions
a) Surface Preparation:
The surface should be dry, clean, sound and free of dust, oil, dirt or adhesion preventive materials should be cleaned from the surface and materials such as mortar and cement residues should be scraped. After the surface cleaning, the surface should be primed with Neroflex primer as a single layer to increase the adhesion strength and balance the surface absorbency and should be allowed to dry for 1-2 hours. In order to increase the adhesion strength before application on exposed concrete surfaces, the surface should be primed with exposed concrete primer as a single layer and allowed to dry for a minimum of 3 hours. Reinforcing Irons; If there is rust on the iron reinforcement, it should be cleaned. Adherence Primer should be applied with a brush as two coats on the iron reinforcement and N7001-03/04 REPAIR ART CR Structural should be applied on the primer before it dries.
b) Product Preparation:
25 kg N7001-03/04 REPAIR ART CR, is poured slowly into 5 - 6 liters of clean water and preferably mixed until homogeneous mixture is obtained. The mixture should be made with a low speed mixer (less than 500 rpm). Any additives not specified in the application instructions should not be added.
c)Application Method:
N7001-03/04 REPAIR ART CR should be applied on all surfaces to be repaired with equal thickness using a steel trowel. After application, the surface should be polished with a damp sponge or trowel.
Issues to be Considered
• As it is cement based, do not breathe powder, do not contact skin and eyes. For further information refer to the Safety Data Sheet.
• The specified consumption is for general information purposes.
They may vary depending on application conditions and surface properties.
Cleaning of Tools:
Tools and equipment used should be cleaned with water after the application N7001-03/04 REPAIR ART CR can only be removed mechanically from the surface after hardening.
Security Warnings
• S2 Keep out of the reach of children.
• S24/25 Avoid contact with eyes and skin.
• S26 In contact with eye, wash with water and consult a doctor.
• S28 In contact with skin, wash immediately with plenty of water.
• S29 Do not empty into drains.
• S46 If swallowed, consult a doctor immediately and show box or label.
Storage
It should be stored in unopened original package in a cool and dry environment by protecting from frost. For short-term storage, maximum 3 pallets should be placed over and over and the shipment should be made with first in first out system. For long-term storage, pallets should not be placed over and over. It can be stored for 12 months from the date of production if proper storage conditions are met. Opened packages should be kept tightly closed and stored under proper storage conditions and should be used within one week.
Consumption The recommended amount of consumption for 2 mm thickness at 1 m2 3,4 - 3,8 kg. This value may vary depending on surface and ambient conditions.
Package 25 kg kraft bags.
N7001-03/04 REPAIR ART CR
Quality Certificates:
Manufactured according to TS EN 1504-3
Export to the Middle East and Europe
Production with Special Production Techniques
Recipes for All Needs
Full Time Secure Shipping