N3002 IZO COAT
Single Component Waterproofing Material
It is a single component, cement based, waterproofing mortar containing chemical additives providing water impermeability.
Consumption:
Recommended consumption for 2 mm film thickness; 3,5 kg/m2
This value may vary depending on surface and ambient conditions.
Package:
25 kg kraft bags.
N3002 izo Coat
Quality Certificates:
Manufactured according to TS EN 1 504-2
Places of Usage:
• Suitable for use in basement walls, water tanks. It is used indoors and outdoors, horizontal and vertical surfaces.
Features/ Advantages:
• It provides the surface is resistant to water pressure coming from the positive side.
• Has high adhesion strength.
Application Directions:
a) Surface Preparation:
It should be ensured that the cement-based surfaces in contact with water are solid, dry, carrier, dust-free and clean and at the same time in balance. The surface should be thoroughly cleaned of all kinds of oil, grease, rust and paraffin residues that will reduce the adherence and there should be no loose particles on the surface. Iron and wooden wedges on the surface should be removed and the gaps formed should be filled with Neroflex Sealant Mortar or Neroflex Structural Repair Mortar, and corners and edges should be chamfeed at least 4 cm radius. The application surface should be wet thoroughly and wait until it becomes wet/dry. If the coating material loses water immediately and becomes matt, it is understood that the surface is not sufficiently wetted or dries quickly. In such cases, when the air is hot or the materials are exposed to the wind, the mixing water of the material can only be increased by 10% for the first coat.
b) Product Preparation:
The water in appropriate amount is poured into the clean mixing vessel with a scale. N3002 lzo Coat is added slowly and mixed with a 400-600 rpm mixer for 3-5 minutes until a uniform and lump-free mixture is obtained. After resting for 3-5 minutes and mixing again for 30 seconds, the material is ready for use.
c)Application Method:
N3002 izo Coat waterproofing mortar is applied in two coats by brush. After the first coat is fully dry, the second coat is applied in a direction perpendicular to the first coat. To ensure continuity of insulation, joints of corners and edges should be chamfered with Neroflex Repair Mortar. Where chamfering is not possible, Neroflex Tape should be applied areas with poor water impermeability, such as joints of edge, corner. In case the subsequent coat application is made 12 hours or more after the previous coat application, the surface should be moistened again before application.
Issues to be Considered:
• If the ambient and surface temperature is below +5° C or above +25° C, suitable temperatures should be waited for N3002 izo Coat application. In addition, application should not be made in extreme hot, rainy or windy weather.
• In exterior surface applications, the surface must be protected from sun, wind, rain and frost for the first 24 hours.
• N3002 izo Coat applied at +23 °c gains mechanical strength after 2 days, becomes water impermeable after 7 days and reaches its final strength after 14 days. High temperatures shorten the time, low temperatures prolong.
• In application, wet film thickness should not exceed 2 mm in one layer. Application should be done in at least two coats.
• Places required to be walked on should be covered with Neroflex Screed or ceramic.
• For pools, vibrating floors and surfaces tent to deflate, N3002 izo Coat should be used.
Cleaning of Tools:
Tools and equipment used should be.cleaned with water after the application. N3002 lzo Coat can only be removed mechanically from the surface after hardening.
Security Warnings:
• S2 Keep out of the reach of children.
• S24/25 Avoid contact with eyes and skin.
• S26 In contact with eye, wash with water and consult a doctor.
• S28 In contact with skin, wash immediately with plenty of water.
• S29 Do not empty into drains.
• S46 If swallowed, consult a doctor immediately and show box or label.
Storage:
It should be stored in unopened original package in a cool and dry environment by protecting from frost. For short-term storage, maximum 3 pallets should be placed over and over and the shipment should be made with first in first out system. For long-term storage, pallets should not be placed over and over. It can be stored for 12 months from the date of production if proper storage conditions are met. Opened packages should be kept tightly closed and stored under proper storage conditions and should be used within one week.
Consumption:
Recommended consumption for 2 mm film thickness; 3,5 kg/m2
This value may vary depending on surface and ambient conditions.
Package:
25 kg kraft bags.
N3002 izo Coat
Quality Certificates:
Manufactured according to TS EN 1 504-2
Export to the Middle East and Europe
Production with Special Production Techniques
Recipes for All Needs
Full Time Secure Shipping